Home › Job titles › Civil Engineers
Civil Engineer Construction Delay Manager salary
2 H-1B filings at 1 employers used the title “Civil Engineer Construction Delay Manager” (after removing seniority prefixes and level numbers). The median offer was $170,000, middle half $170,000–$170,000. Versus the BLS median for the same occupation and city: +56%.
Most often classified as Civil Engineers (SOC 17-2051), BLS US median $100,840.
Highest-paying employers
10+ filingsNo employer has 10+ filings for this title.
Most filings
| Employer | Filings | Median | vs market |
|---|---|---|---|
| Secretariat Advisors | 2 | $170,000 | +56% |
By city
| Metro | Filings | Median | Market |
|---|---|---|---|
| Los Angeles, CA | 2 | $170,000 | $109K |
By experience level
| Level | Filings | P25 | Median | P75 |
|---|---|---|---|---|
| Level IV · fully competent | 2 | $170K | $170,000 | $170K |
By title prefix
No prefix $170K 2
Related titles
same occupation codeProject Engineer $93K 1,669Civil Engineer $76K 760Structural Engineer $94K 298Professional $112K 200Field Engineer $80K 189Transportation Engineer $89K 170Geotechnical Engineer $89K 116Graduate Engineer $85K 113Data Center Infrastructure Engineer $140K 94Civil Engineering $87K 56Engineer in Training $80K 49Engineering Specialist $94K 43
H-1B Labor Condition Applications show the wage an employer offers a foreign worker it sponsors (certified FY2025 filings). They cover only those positions, not the whole company, and exclude bonuses and equity.